More power for the property

Electrical Service Capacity Upgrades in San Francisco

A heat pump, second EV or new apartment can change how much power your building needs. We assess your existing electrical service, calculate the added load and explain whether a circuit, a managed load or a utility service upgrade fits the job.

Max Electric · California C-10 electrical contractor license #1148391

Build a load list before selecting an amp rating

Planned changeDetails that help the review
EV chargingCar, charger model, hours parked and whether charging can be scheduled.
Heat pump or electric water heaterEquipment ratings, any auxiliary heat and the appliance being replaced.
Kitchen or laundry conversionRange, cooktop, dryer and other loads that may run together.
ADU or additional unitSeparate living equipment, distribution layout, metering requirements and design documents.

Responsibilities during a service increase

  1. Assessment

    Start with the equipment you have now and the appliances you intend to add. Where suitable, interval usage data from PG&E can help an electrician evaluate existing demand. Nameplate ratings and an assessment of the proposed loads complete the picture. PG&E’s guide to evaluating home electrical capacity.

  2. Utility and city coordination

    When the property needs more incoming power, PG&E checks whether its existing supply can serve the request. A change to the meter position, underground route or utility equipment can affect both price and timing. Use PG&E’s application resources to identify the route for your type of work.

  3. Construction and changeover

    We plan the changeover around the work on the property, required inspection and utility arrangements. Put the expected outage window and the person who will confirm reconnection in the project schedule. Follow the PG&E service-upgrade roadmap.

Separating today’s project from the wish list

Equipment already ordered

Give the estimator the exact model numbers from the purchase and mark which appliances or systems they will replace.

Work you might do later

List a possible second charger or future addition separately. Ask which pieces of today’s installation could serve both plans and which costs belong only to the future project.

Do you need 200 amps to add one appliance?

What the assessment showsA practical next step
Available capacity at the existing serviceA new circuit may be enough. The electrician still checks panel space, breaker compatibility and a route to the appliance. A full directory by itself does not settle the service-size question.
Demand peaks that can be managedIf the car usually stays parked overnight, compare a lower charging rate with a controller that adjusts charging when the house uses more power. Check that the car can still recover the miles you need by morning.
Demand exceeds available capacityRequest the proposed service size and the work required on both sides of the meter. A utility design decision can affect the meter location or supply route before an electrician can give you a firm installation date.

Comparing two estimates that both say “200 amps”

Mark the work on a property plan

One proposal might replace the meter and main panel in their current location. Another might assume a new service entry on the opposite wall. Ask each bidder to mark the service entrance, meter, panel and cable route on the same sketch. A path across a paved driveway can add excavation and surface restoration even when both proposals specify the same service rating.

Ask who finishes each part

Look for who pays utility charges, who opens and restores the trench if one is needed, and who patches walls or stucco around the meter. If a route awaits utility approval, ask how a change would be priced before committing to the work. That gives you an installed cost you can compare with the other bid.

A five-unit example on Gladys Street

At this San Francisco building, Max Electric replaced existing knob-and-tube wiring and increased the service from 60 to 400 amps. Five meters served apartments and a sixth served common areas. The electrical room, overhead service and tenant phasing were all part of the project.

That scale is useful context for a multi-unit owner. A single-family property adding one appliance may have a much smaller scope. See the Gladys Street project.

What affects cost and lead time

Service location, overhead or underground supply, the condition of meter equipment, access for new conductors and any required civil work can all affect the estimate. Utility work and inspection appointments can also determine when the final cutover is possible.

Our 11th Avenue duplex renovation illustrates the difference between installation time and the full project calendar. The two-unit rewire and 400-amp upgrade included a utility secondary service box replacement, and the renovation ran for eight months. For your property, ask which dates cover on-site work, which depend on PG&E and which must fall before the walls are closed.

Questions about increasing electrical capacity

Does a 200-amp main mean every new appliance will fit?

The service rating is a limit, not a tally of available capacity. Existing and proposed loads must be assessed. A new electric range and a managed EV charger can affect the calculation differently.

Can a load-management device avoid a service change?

Sometimes. The design must identify what is controlled, how the equipment operates within the available capacity and whether it meets the property’s needs.

When should I contact the utility?

Early when the proposed work involves the point of service, incoming conductors, metering or a change in capacity. We identify the coordination needed so that the electrical work and utility work can be scheduled together.

Discuss added capacity

List the loads you want to add and the models you have selected. If this is a multi-unit building, tell us whether the work affects an apartment, common equipment or the whole service.