Max Electric completed a full electrical renovation of a two-unit duplex on 11th Avenue, including complete rewiring, all-new circuits, appliance connections, a 400A service upgrade, PG&E coordination, and secondary service box replacement.

Location 11th Avenue, San Francisco
Property Type Two-Unit Duplex
Project Value $80,000
Completed 400A service upgrade equipment for duplex in San Francisco
Old duplex service equipment before 400A upgrade
Completed secondary service box and sidewalk repair after utility work
Complete electrical modernization for both units The finished system provides 200A service for each unit, dedicated common-area capacity, and modern electrical support for appliances and future use.
Project Full Duplex Rewire & 400A Service Upgrade
Address Area 11th Avenue, San Francisco, CA
Completed Scope Full rewiring, new circuits, appliance connections, 400A service upgrade, and PG&E coordination.
Timeline Completed over an eight-month renovation period.

A complete electrical renovation for a two-unit San Francisco duplex

This 11th Avenue project required more than a panel change or isolated circuit work. Max Electric modernized the electrical system across both units, replacing outdated wiring, installing new circuits, and preparing the property for modern appliance loads and long-term residential use.

The work included full electrical rewiring of both units, new appliance circuits, a 400A service upgrade, and a dedicated common-area service. The upgraded layout provides 200A service for each unit and 100A service for shared areas.

Because the project involved both building renovation and utility work, the schedule had to be managed in phases. Our team coordinated construction sequencing, PG&E requirements, and secondary service box replacement so the full electrical modernization could be completed properly.

Original duplex service equipment before electrical modernization
The original electrical setup was replaced as part of a larger modernization designed to support two separate residential units and common-area electrical loads.
Project Impact

What this duplex upgrade needed to accomplish

The project had to modernize the entire electrical system, increase service capacity, support new appliance circuits, and coordinate utility work without losing control of the renovation timeline.

400A New service capacity

The property was upgraded to a 400A service to support two units and common areas.

2 Units rewired

Both duplex units received complete rewiring and new electrical circuits.

100A Common-area service

A dedicated common-area service was included in the upgraded electrical layout.

8 mo. Coordinated timeline

The full renovation was completed over an eight-month project period.

Work Completed

Electrical services completed by Max Electric

The scope combined full-unit rewiring, service upgrade planning, utility coordination, secondary service box replacement, and new circuit installation for modern residential use.

Finished exterior after 11th Avenue service upgrade
01

Full Duplex Rewiring

Both units were rewired to replace outdated electrical infrastructure and support modern residential loads.

02

400A Service Upgrade

The service was upgraded to provide 200A capacity for each unit and dedicated 100A common-area service.

03

PG&E Coordination

Utility coordination was part of the project because the service upgrade required work beyond the building itself.

04

Secondary Service Box Replacement

The secondary service box serving the property was replaced as part of the electrical service modernization.

05

Appliance Circuits

New dedicated circuits were installed to support modern appliances throughout the duplex.

06

Multi-Unit Electrical Renovation

The final system was planned around two separate units, common areas, utility requirements, and long-term serviceability.

PG&E sidewalk markings for 11th Avenue service upgrade
Excavation for secondary service box replacement during utility upgrade
The Challenge

Managing a full rewire, service upgrade, and utility work in phases

The main challenge was coordinating several major scopes at once: rewiring both units, installing new circuits, upgrading the service to 400A, and replacing the secondary service box. Each part had to fit into the larger renovation schedule without creating delays for the property owner.

Utility coordination added another layer of complexity. Our team worked around PG&E requirements, exterior access, sidewalk preparation, and service equipment changes while keeping the project organized across an eight-month timeline.

01

Electrical renovation planned in phases

The work was sequenced around construction progress, utility requirements, and the needs of both units.

02

Service upgrade coordinated with PG&E

The 400A service upgrade required planning beyond the panel location, including utility-side coordination and service box replacement.

03

Future-ready capacity delivered

The completed system was designed to support modern living, appliance loads, and separate service needs for each unit.

Our Process

How the duplex modernization was handled

The process was built around clear planning, phased construction, utility coordination, new service equipment, and final system readiness for both residential units.

Existing system reviewed

We evaluated the original electrical equipment, service needs, and renovation goals before finalizing the upgrade path.

Rewire and circuits installed

Both units received new wiring and circuits to support modern appliances and everyday residential electrical use.

Utility work coordinated

PG&E coordination and secondary service box replacement were managed as part of the broader service upgrade.

400A service completed

The final system delivered 200A service for each unit, dedicated common-area service, and improved long-term capacity.

The result: a fully modernized duplex electrical system

Max Electric completed the full duplex rewire and 400A service upgrade over an eight-month period. The property now has increased electrical capacity, all-new circuits, modern appliance support, and a service layout designed around two residential units plus shared areas.

The upgraded system gives the property a stronger electrical foundation for modern living. With 200A service for each unit and dedicated common-area capacity, the duplex is better prepared for today’s electrical demands and future improvements.

Both units fully rewired

The duplex received a complete wiring renovation across both residential units.

400A service capacity added

The property now supports 200A service for each unit and 100A common-area service.

Utility upgrade completed

PG&E coordination and secondary service box replacement were completed as part of the modernization.

Final 400A service equipment after duplex electrical modernization
Completed secondary service box and sidewalk repair after service upgrade
Project Photos

Service upgrade planning, utility work, and completed exterior details

This project required both building-side electrical renovation and utility-side coordination, including sidewalk preparation, secondary service box replacement, and final exterior restoration.

Work With Max Electric

Planning a full rewire or service upgrade for your property?

Max Electric helps homeowners, property owners, landlords, contractors, and building managers complete major electrical renovations safely and efficiently. From full rewiring and new circuits to service upgrades and utility coordination, our team plans the work around real building conditions.

1
Full rewiring experience We handle complete electrical renovations for older homes, duplexes, and multi-unit properties.
2
Service upgrade planning We help plan larger service upgrades around capacity needs, panel layouts, and utility requirements.
3
PG&E coordination Projects involving utility work are coordinated carefully to reduce delays and keep the upgrade moving.
4
Modern electrical capacity We build systems that support appliances, common areas, future upgrades, and everyday electrical demand.

Tell us about your electrical project

Share your property type, current service size, renovation plans, appliance needs, and any utility coordination concerns. We’ll help identify the next practical step.

Full house and duplex rewiring
400A service upgrades and larger electrical capacity
Appliance circuits and modern residential loads
PG&E coordination and service equipment upgrades