Complete Residential Rewiring · San Francisco

Whole-House Rewiring in San Francisco

Replace aging, ungrounded, damaged, or piecemeal wiring with a planned electrical system built for the way your home works now. Max Electric coordinates circuits, panel capacity, access, permits, testing, and the details that matter in older San Francisco houses.

Occupied-home planning Permit coordination Grounded circuits CSLB #1148391 · C-10
Start with the actual system

A full rewire is a project decision, not a response to one bad outlet

Whole-house rewiring makes sense when outdated or unreliable wiring is spread across many rooms, when a renovation exposes broad electrical limitations, or when the home needs a coherent plan for modern loads. A single failed device or one damaged circuit may need a focused repair instead.

San Francisco homes rarely present a clean before-and-after picture. One floor may have newer grounded circuits while another still relies on older two-wire branches. An addition may have been updated years ago, but lighting circuits inside plaster walls were left alone. We trace what is active and check the panel and grounding. Only then do we separate a local defect from a system-wide problem.

Not every older home needs every wall opened. Access from an attic, basement, crawlspace, garage, closet, or existing chase can change the routing plan considerably. The assessment should come before assumptions about demolition.
Electrician routing new cable through planned access openings in an older San Francisco home
When to investigate

Conditions that can point to a broader wiring problem

No single symptom proves that the whole house needs rewiring. Several recurring conditions across different rooms are more meaningful than one isolated failure.

01

Ungrounded circuits across the home

Two-slot receptacles and missing equipment grounding paths often point to original wiring. Mixed grounded and ungrounded branches deserve a closer look.

02

Active knob-and-tube wiring

Visible K&T is only part of the picture. Circuit tracing helps determine whether old branches still serve lights or receptacles. Switch legs may follow a different route.

03

Repeated faults in several areas

Warm devices, intermittent power, brittle insulation, unsafe splices, or recurring trips in unrelated rooms may justify a system-level review.

04

A major remodel is opening walls

When framing is already accessible, it may be practical to replace hidden wiring, add circuits, and correct layouts before finishes return.

05

The home is moving toward all-electric

Heat pumps, induction cooking, EV charging, laundry equipment, and an ADU can change both branch-circuit needs and service planning.

06

The panel no longer matches the house

Poor labeling, crowded modifications, obsolete equipment, or too few usable spaces can complicate a safe rewiring plan.

Project scope

What a whole-house rewiring plan can include

The finished system should reflect how each room will be used. Equipment plans and future work matter too. Simply putting new cable in every old location can preserve a poor layout.

  • Tracing existing branches and identifying circuits that remain active
  • New grounded wiring for receptacles, lighting, and fixed equipment
  • Kitchen, laundry, bathroom, garage, and outdoor circuit planning
  • GFCI and AFCI protection where the permitted scope requires it
  • Smoke and carbon-monoxide alarm power planning when applicable
  • New device boxes, receptacles, switches, and practical locations
  • Panel schedules, circuit labeling, testing, and closeout records
  • Coordination with a panel or service upgrade when capacity is limited
  • Preparation for EV charging, heat pumps, solar, storage, or an ADU
  • Permit and electrical inspection coordination for the approved scope

Whole-house rewiring does not automatically mean a service upgrade.

A load calculation, existing service rating, equipment plan, and panel condition should guide that decision. Some projects need branch wiring only. Others work better when rewiring and the service change are planned together. Max Electric evaluates service capacity separately through its electrical service upgrade.

Older-home logistics

Plaster, access, occupied rooms, and finish work belong in the estimate

A realistic proposal explains how electricians expect to reach each area, what furniture or storage must move, whether rooms can remain in use, and who handles patching and paint.

Planning questionWhy it changes the jobWhat to establish before work
Where can cable be routed?Attics, unfinished basements, crawlspaces, garages, closets, and chases can reduce wall openings.Document preferred routes and inaccessible areas during the site walk.
Will the home be occupied?Daily cleanup, temporary power, room sequencing, pets, and quiet hours affect scheduling.Agree on work zones and which circuits may be off each day.
Who restores finishes?Electrical access and plaster repair are different trades, and assumptions create disputes.State whether patching, texture, paint, and trim are included or handled separately.
What equipment is planned?Induction ranges, heat pumps, dryers, EV chargers, and workshops may need dedicated circuits.Provide model numbers or electrical requirements before circuit sizing.
Does the permit scope affect other work?A remodel, panel change, or service upgrade can alter inspection sequencing.Coordinate the electrical schedule with the owner, designer, contractor, DBI, and PG&E when involved.
From assessment to closeout

How a complete rewire is planned and delivered

01

Survey the house

We review the panel, accessible wiring, grounding, rooms, known problems, and future electrical loads.

02

Define circuits and access

The proposal identifies the intended rooms, devices, dedicated loads, likely routes, exclusions, and finish-work responsibilities.

03

Coordinate permits and schedule

Required electrical permits and inspections are matched to the work sequence. Occupied homes are divided into practical zones.

04

Install, test, and label

New circuits are completed, tested, identified at the panel, and prepared for the applicable inspection and project closeout.

If inspection finds a limited defect rather than a house-wide issue: Max Electric can quote it as a focused electrical wiring installation or repair instead of a full-home project.
Pricing without guesswork

What determines whole-house rewiring cost in San Francisco

Square footage matters, but access and circuit count often matter more. Two homes with the same floor area can require very different labor when one has open basement routes and the other has finished plaster across several levels.

  • Number of floors, rooms, circuits, fixtures, switches, and receptacles
  • Plaster and lath, finished ceilings, tile, built-ins, and limited access
  • Occupied-home phasing versus an open remodel
  • Panel condition, grounding, service capacity, and equipment location
  • Permit, inspection, engineering, utility, and finish-restoration scope

A useful estimate states what is included. It also identifies what remains uncertain until access is created and which work belongs to another contractor. A single online average cannot do that.

Helpful details for the first conversation

Send the property address, approximate year built, floor count, photos of the panel and service equipment, known wiring type, renovation plans, and any report or insurance notice you already have. Those details help us prepare for the site visit, but they do not replace an on-site assessment.

Homeowner questions

Whole-house rewiring FAQ

Can a house be rewired without removing all the plaster?

Often, yes. Electricians may use attics, basements, crawlspaces, closets, existing chases, and carefully selected access openings. The amount of opening depends on framing, fire blocks, finished surfaces, and the locations being served. A site assessment is needed before anyone can promise a low-impact route.

Can we live in the house while it is being rewired?

Some occupied homes can be completed in zones, with agreed work hours, daily cleanup, and temporary-power planning. The answer depends on project size, access, household needs, and how long essential circuits must remain off. Larger remodels may be safer and faster in an unoccupied space.

Does new wiring require a new electrical panel?

Not automatically. The existing panel, service rating, usable breaker spaces, equipment condition, and calculated loads determine whether it can support the new circuit plan. Panel replacement and service upgrades are separate decisions.

Is whole-house rewiring the same as knob-and-tube replacement?

No. Knob-and-tube replacement addresses active K&T circuits. A whole-house rewire may be broader and can involve other aging wiring types, poorly modified circuits, remodeling changes, and a new layout for modern loads. If you only need to document whether K&T is active, start with the dedicated inspection service.

Who repairs the access openings after the electrical work?

That responsibility should be written into the proposal. Electricians create the access needed for wiring, while finish plaster, texture, paint, tile, cabinetry, or specialty trim may be handled by a separate trade. Max Electric will clarify the intended division before work begins.

How long does a whole-house rewire take?

Duration depends on home size, access, whether the property is occupied, inspection scheduling, service or panel work, and finish coordination. A small open-frame remodel and a finished multi-story Victorian should not be given the same schedule. We provide a project-specific sequence after the assessment.

Request a Rewiring Assessment

Plan the rewire before opening the house

Describe the home, the wiring concerns, and what the finished electrical system needs to support. We will use those details to prepare for the first conversation and determine whether the likely scope is a complete rewire, phased work, or a narrower repair.

  • San Francisco address, home type, and approximate age
  • Known wiring type, panel photos, and current trouble spots
  • Rooms or floors included in the proposed work
  • Occupancy, access constraints, and preferred timing

Request Whole-House Rewiring Service